INSTALLATION STORIES
Cosmetics Container
Line
Year Completed:
2021
Client:
Jiaheng, Dabao, Johnson & Johnson
China
Market:
Cosmetics industry
Highlight:
Precise Handling
Compliance with Regulatory Standards
Cost Effective
Modification on Current Layout
.jpg)
Use specialized rigging equipment and techniques to lift and position heavy machinery into place safely.
_edited.jpg)
Unpack packages, connect pecies, and mount integrated machinery on the floor.

Check the efficiency and commissioning of newly installed lines by running lines with bananas .

Precisely adjust and integrate new processing line into the old lines.
The cosmetics industry is experiencing continuous growth worldwide, driven by evolving consumer preferences, innovation in product formulations, and increasing demand for beauty and personal care products. This project outlines the checking, packaging, installation, and commissioning of a cosmetics manufacturing plant aimed at producing a wide range of skincare, haircare, and beauty products.
The plant aims to integrate advanced manufacturing technologies, adhere to stringent quality standards, and meet diverse market demands for high-quality, safe, and innovative beauty products.
We have had many valuable customers in the cosmetics industry in the past 10 years, including Jiaheng, Dabao, Johnson & Johnson, etc. Most of the related projects were built based on old facilities, considering the existing facility and utility layout. Our engineers integrated new equipment and modified the previous layout to get a smoother manufacturing process and effective production rate. The whole factor was updated by various functions, equipped with production areas, laboratories for research and development, packaging lines, and administrative offices.
Beyond installation on-site, our engineers went to the equipment supplier's warehouse, to ensure all packing equipment met regulations and requirements. With adequate preparation and effective project management, our team cut down the project time by 10%, which helped our client back to their normal production pace shortly with up to $50,000 saving profit.